Thermo Scientific iS5N Series User Manual page 42

Table of Contents

Advertisement

3
Maintenance
Installing or Replacing Hardware
38
Nicolet iS5N Spectrometer User Guide
3. Wrap the reducing nipple or the 1/4-inch male fitting with pipe tape, and then install the
pressure coupling. Use a 3/4-inch open-ended wrench to tighten the connection.
4. Snap the male inlet of the wall plumbing assembly firmly into the pressure coupling.
Refer to this drawing when performing this and subsequent steps:
To accessory
Pressure regulator
Flowmeter
5. Turn off the instrument power, unplug the power cord and remove all accessories and
samples from the system. See
for instructions.
WARNING Before you open the desiccant compartment, turn off the instrument
power, unplug the power cord and remove all accessories and samples from the
system. Entry of flammable liquids or gases into the desiccant compartment is an
explosion hazard. If such entry occurs, contact us immediately and do not apply
power to the instrument until the condition has been corrected.
Pressure coupling
Pressure regulator
Wall plumbing assembly
Turning the Power On and Off
To spectrometer
Flowmeter
and
Removing an Accessory
Thermo Scientific

Advertisement

Table of Contents
loading

Table of Contents