10.4 Battery Storage and Recharge

Battery Acceptance Inspection
A battery recharge label must be put on the battery packing case to indicate the
latest charge time.
Battery Storage Requirements
1.
2.
3.
4.
5.
6.
Issue 03 (2022-10-28)
Alarm
Severi
ty
Major
Major
Place batteries according to the signs on the packing case during storage. Do
not put batteries upside down or sidelong.
Stack battery packing cases by complying with the stacking requirements on
the external package.
Handle batteries with caution to avoid damage.
The storage environment requirements are as follows:
Ambient temperature: –10°C to +55°C; recommended storage
temperature: 20°C–30°C
Relative humidity: 5% to 80% RH
Dry, clean, and well-ventilated
Away from corrosive organic solvents and gases
Away from direct sunlight
At least 2 meters away from heat sources
Before storing batteries, disconnect them from external devices.
AC mains input voltage at the recharge position: single-phase power grid,
200/208/220/230/240 V AC
Copyright © Huawei Digital Power Technologies Co., Ltd.
Causes
Alarm
Locating
The
communica
tions cable
between
the SMU
and the
module is
loose.
The system
experiences
a power
failure
during an
upgrade.
10 System Maintenance
Suggestion
1. Power off and then
power on the module,
and check whether the
module running
information is normal.
If yes, no further
action is required.
If no, contact Huawei
technical support.
1. Upgrade the power
module again and
check whether the
alarm is cleared. If yes,
no further action is
required.