iSitePower-M V100R002C00
User Manual (MAP05A1, MAB05B1)
Figure 5-4 Marking mounting holes for the base
Step 3 Mark the mounting holes for battery modules.
Figure 5-5 Marking the mounting holes for battery modules
Step 4 Drill holes and install expansion bolts.
When drilling holes, avoid the water pipes and power cables buried in the wall.
Issue 03 (2022-10-28)
D ANGER
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 System Installation
49