iSitePower-M V100R002C00
User Manual (MAP05A1, MAB05B1)

9.2 Battery Commissioning

● When the output voltage system is adjusted, the system is powered off and
● If there is no AC input, the product will be powered off during the upgrade.

9.2.1 Installing the App

Prerequisites
Downloading and Installing the NetEco App
Figure 9-1 QR code

9.2.2 New Site Deployment

Refer to
scan the QR code to obtain
Issue 03 (2022-10-28)
NO TICE
then restarted. No manual operation is required.
Therefore, you are advised to upgrade the product when AC input is available.
A mobile phone running Android 8.0 or later is available.
The app cannot be installed on a tablet, folding screen, or landscape screen
device.
Method 1: Search for NetEco in Huawei AppGallery and download the latest
installation package.
Method 2: Scan the QR code to download and install the latest installation
package.
iSitePower-M App Quick Guide to perform app commissioning. You can
Copyright © Huawei Digital Power Technologies Co., Ltd.
iSitePower-M App Quick Guide .