Huawei iSitePower-M ISP-M-MAB05B1 Manual page 61

Intelligent power mate
Table of Contents

Advertisement

iSitePower-M V100R002C00
User Manual (MAP05A1, MAB05B1)
Figure 5-6 Installing expansion bolts
Figure 5-7 M6 expansion bolt structure
(1) Bolt
(4) Flat washer
Issue 03 (2022-10-28)
NO TE
Use the M6x60 expansion bolts delivered with the product to secure the mounting base. If
the length or quantity of the M6x60 expansion bolts cannot meet the installation
requirements, prepare M6 stainless steel expansion bolts by yourself. The expansion bolts
delivered with the product are used for solid brick walls and concrete grounds. If other
types of walls and grounds are used, ensure that the load bearing capacity requirements
(the weight of one battery module is 50 kg) are met and appropriate bolts are selected.
Copyright © Huawei Digital Power Technologies Co., Ltd.
(2) Nut
(5) Expansion sleeve
5 System Installation
(3) Spring washer
50

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isitepower-m isp-m-map05a1

Table of Contents