User Manual (MAP05A1, MAB05B1)
Figure 8-53 Installing monitoring communications cables
----End
8.5 (Optional) Installing Cables in Capacity Expansion
Scenario
● In capacity expansion scenarios, bottom cascading cables must be routed from
● Cables outside the device must be routed through cable pipes.

8.5.1 Installing Ground Cables

Ensure that the ground cable is securely connected. Otherwise, electric shocks may
occur.
Procedure
Step 1 Install ground cables.
Issue 03 (2022-10-28)
NO TICE
the rear of the product.
D ANGER
Copyright © Huawei Digital Power Technologies Co., Ltd.
8 Electrical Connection