iSitePower-M V100R002C00
User Manual (MAP05A1, MAB05B1)
Figure 4-4 Grid scenario network diagram (multiple products connected in
parallel)
In the grid scenario, the power system works circularly as follows. The power
source preference sequence is grid > battery.
1.
2.
Issue 03 (2022-10-28)
If grid power is available, grid power is supplied to loads and charges
batteries if batteries are not fully charged.
If grid power is unavailable or abnormal (such as abnormal frequency,
overvoltage, or undervoltage), batteries supply power to loads.