Application Scenarios - Huawei iSitePower-M ISP-M-MAB05B1 Manual

Intelligent power mate
Table of Contents

Advertisement

iSitePower-M V100R002C00
User Manual (MAP05A1, MAB05B1)
The iSitePower-M is mainly used in houses, apartments, shops, and business
outlets. Based on different energy inputs, the application scenarios are classified
into four types.
In a parallel system, the battery depth of discharge (DOD) settings of the master
and slave products can be different. When setting the battery DOD, you need to
set the master and slave products separately.
Optimizers are not supported in any scenario.
In low irradiance scenarios, when batteries are overdischarged and the power grid
is abnormal, if a battery module fails to start due to low irradiance protection, the
handling suggestions are as follows (by priority):
Method 1: Wait for the power grid to recover, and then the battery module can
start properly.
Method 2: If the battery module is not fully discharged and is shut down, start it
by turning on the manual ON/OFF switch. If the battery module is fully
discharged, activate and start it using other batteries with sufficient reserve.
Method 3: Charge the battery module at high irradiance for a maximum of half an
hour, it can start properly. If it does not start and no alarm is generated during the
charging period, please wait.
Issue 03 (2022-10-28)
Solar-Only scenario
Grid Scenario
Solar-Grid Hybrid Scenario
Solar-Genset Hybrid Scenario
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
4

Application Scenarios

4 Application Scenarios
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isitepower-m isp-m-map05a1

Table of Contents