Grid Scenario - Huawei iSitePower-M ISP-M-MAB05B1 Manual

Intelligent power mate
Table of Contents

Advertisement

iSitePower-M V100R002C00
User Manual (MAP05A1, MAB05B1)
2.
3.

4.2 Grid Scenario

Figure 4-3 Grid scenario network diagram (one product)
Issue 03 (2022-10-28)
If the solar power is less than the load power, solar power and battery power
are supplied to loads at the same time.
If there is no solar power, batteries power loads.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Application Scenarios
33