Huawei iSitePower-M ISP-M-MAB05B1 Manual page 9

Intelligent power mate
Table of Contents

Advertisement

iSitePower-M V100R002C00
User Manual (MAP05A1, MAB05B1)
Contents
5.2 Installing a Mounting Bracket.......................................................................................................................................... 48
5.2.1 Ground Mounting.............................................................................................................................................................. 48
5.2.2 Wall Mounting....................................................................................................................................................................51
5.3 Installing Modules................................................................................................................................................................ 53
5.4 (Optional) Installing Battery Modules for Capacity Expansion............................................................................ 55
5.5 (Optional) Installing an AC Parallel Box.......................................................................................................................56
6 Setting the DIP Switch......................................................................................................... 58
7 Preparing Cables....................................................................................................................60
7.1 Cables delivered with the product.................................................................................................................................. 60
7.2 Cables prepared by the customer................................................................................................................................... 61
7.2.1 Solar-Only Scenario.......................................................................................................................................................... 61
7.2.2 Grid Scenario....................................................................................................................................................................... 62
7.2.3 Solar-Grid Hybrid Scenario.............................................................................................................................................64
7.2.4 Solar-Genset Hybrid Scenario....................................................................................................................................... 65
8 Electrical Connection............................................................................................................68
8.1 Solar-Only Scenario..............................................................................................................................................................68
8.1.1 Installing Ground Cables................................................................................................................................................. 69
8.1.2 Installing the Internal Cable.......................................................................................................................................... 70
8.1.3 Installing PV Input Power Cables................................................................................................................................. 72
8.1.4 Install the AC Output Power Cable............................................................................................................................. 73
8.1.5 Installing Cables in a Parallel System......................................................................................................................... 74
8.1.5.1 Installing a Ground Cable for the Parallel Box.................................................................................................... 74
8.1.5.2 Installing AC Output Power Cables in a Parallel System................................................................................. 75
8.1.5.3 Installing Communications Cables in a Parallel System................................................................................... 77
8.2 Grid Scenario.......................................................................................................................................................................... 78
8.2.1 Installing Ground Cables................................................................................................................................................. 78
8.2.2 Installing the Internal Cable.......................................................................................................................................... 79
8.2.3 Install the AC Output Power Cable............................................................................................................................. 82
8.2.4 Install the AC Input Power Cable................................................................................................................................. 84
8.2.5 Installing Cables in a Parallel System......................................................................................................................... 85
8.2.5.1 Installing a Ground Cable for the Parallel Box.................................................................................................... 85
8.2.5.2 Installing AC Input Power Cables in a Parallel System..................................................................................... 86
8.2.5.3 Installing AC Output Power Cables in a Parallel System................................................................................. 88
8.2.5.4 Installing Communications Cables in a Parallel System................................................................................... 90
8.3 Solar-Grid Hybrid Scenario................................................................................................................................................ 91
8.3.1 Installing Ground Cables................................................................................................................................................. 91
8.3.2 Installing the Internal Cable.......................................................................................................................................... 92
8.3.3 Installing PV Input Power Cables................................................................................................................................. 95
8.3.4 Install the AC Output Power Cable............................................................................................................................. 96
8.3.5 Install the AC Input Power Cable................................................................................................................................. 97
8.3.6 Installing Cables in a Parallel System......................................................................................................................... 99
Issue 03 (2022-10-28)
Copyright © Huawei Digital Power Technologies Co., Ltd.
v

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isitepower-m isp-m-map05a1

Table of Contents