6.5
Setting Battery Parameters
If the solar inverter connects to batteries, set battery parameters.
1. Log in to the FusionSolar app and choose My >
Device commissioning. The Device commissioning
screen (Refer to 7.1 Device Commissioning.) is
displayed.
2. Choose Power adjustment > Battery control and set
battery parameters, including Charge from grid,
Control mode (Fully fed to grid, TOU(Time-of-use),
Maximum self-consumption), and so on.
7
FAQ
7.1
Device Commissioning
1. Access Device commissioning.
Scenario 1: Your phone is not
connected to the Internet.
When your phone is
connected to the
Internet, Device
commissioning is not
displayed after you tap
....
Scenario 2: Your phone is
connected to the Internet.
18
Need help?
Do you have a question about the SUN2000 3,6KTL-L1 and is the answer not in the manual?
Questions and answers