Huawei iSitePower-M ISP-M-MAB05B1 Manual page 123

Intelligent power mate
Table of Contents

Advertisement

iSitePower-M V100R002C00
User Manual (MAP05A1, MAB05B1)
● A surge protection device must be configured for the upstream AC input of the
● The upstream AC input of the system must be configured with an AC circuit
● No leakage protection device is required for the upstream AC input. If a
Procedure
Step 1 Connect AC power cables to the terminal connectors.
Figure 8-46 Connecting cables to terminals
Step 2 Install the AC input power cable and secure the cable using cable clips.
Issue 03 (2022-10-28)
NO TICE
system. You need to configure and install the device by yourself.
breaker with a capacity of 40 A. The circuit breaker needs to be configured by
the customer. The D-type tripping circuit breaker cannot be used because it
cannot effectively protect the product.
leakage protection device is configured, it is recommended that the leakage
current be greater than or equal to 100 mA x
power modules.
NO TE
In a single-node system, connect the other end of the AC input power cable to an AC PDC.
In a parallel system, connect the other end of the AC input power cable to the AC parallel
box.
Copyright © Huawei Digital Power Technologies Co., Ltd.
8 Electrical Connection
n , where n is the number of
112

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isitepower-m isp-m-map05a1

Table of Contents