iSitePower-M V100R002C00
User Manual (MAP05A1, MAB05B1)
11.1 Uneven Ground During the Installation
Use washers in the fitting bag to level the ground.
11.2 Tools for Preparing PV Cables
Use dedicated tools to prepare PV cables. Crimping tool model: PV-CZM-41100;
open-end wrench model: PV-MS-HZ
11.3 Special Cables
The battery power cable, battery power connector, and battery communications
cable are customized to be waterproof and moisture-proof. If they are lost or
damaged, contact your installer for replacement. Do not purchase or replace them
by yourself.
11.4 Removing Power Terminals
There are three methods of using the cable removal tool. Select a proper method
based on the actual situation.
Figure 11-1 Usage of the removal tool
(1) Power parallel port for
battery modules
Issue 03 (2022-10-28)
Copyright © Huawei Digital Power Technologies Co., Ltd.
(2) Battery cascading port
11
FAQs
(3) PV input port
11 FAQs
154