Huawei iSitePower-M ISP-M-MAB05B1 Manual page 10

Intelligent power mate
Table of Contents

Advertisement

iSitePower-M V100R002C00
User Manual (MAP05A1, MAB05B1)
Contents
8.3.6.1 Installing a Ground Cable for the Parallel Box.................................................................................................... 99
8.3.6.2 Installing AC Input Power Cables in a Parallel System...................................................................................100
8.3.6.3 Installing AC Output Power Cables in a Parallel System............................................................................... 102
8.3.6.4 Installing Communications Cables in a Parallel System................................................................................ 104
8.4 Solar-Genset Hybrid Scenario........................................................................................................................................ 105
8.4.1 Installing Ground Cables.............................................................................................................................................. 105
8.4.2 Installing the Internal Cable........................................................................................................................................ 106
8.4.3 Installing PV Input Power Cables.............................................................................................................................. 109
8.4.4 Install the AC Output Power Cable...........................................................................................................................110
8.4.5 Install the AC Input Power Cable.............................................................................................................................. 111
8.4.6 Installing Genset Control Signal Cables.................................................................................................................. 113
8.4.7 Installing Cables in a Parallel System...................................................................................................................... 114
8.4.7.1 Installing a Ground Cable for the Parallel Box.................................................................................................. 114
8.4.7.2 Installing AC Input Power Cables in a Parallel System...................................................................................115
8.4.7.3 Installing AC Output Power Cables in a Parallel System............................................................................... 116
8.4.7.4 Installing Communications Cables in a Parallel System................................................................................ 118
8.5 (Optional) Installing Cables in Capacity Expansion Scenario............................................................................. 119
8.5.1 Installing Ground Cables.............................................................................................................................................. 119
8.5.2 Installing the Internal Cable........................................................................................................................................ 120
8.6 (Optional) Connecting a Remote EPO Cable........................................................................................................... 122
8.7 Verifying the Installation................................................................................................................................................. 123
8.7.1 Verifying the Installation.............................................................................................................................................. 123
8.7.2 Arranging Cables............................................................................................................................................................. 124
8.7.3 Subsequent Operations................................................................................................................................................. 124
9 System Commissioning...................................................................................................... 128
9.1 System Power-On............................................................................................................................................................... 128
9.2 Battery Commissioning.................................................................................................................................................... 129
9.2.1 Installing the App............................................................................................................................................................ 129
9.2.2 New Site Deployment....................................................................................................................................................129
10 System Maintenance........................................................................................................ 131
10.1 System Power-Off............................................................................................................................................................ 131
10.2 Routine Maintenance..................................................................................................................................................... 131
10.3 Troubleshooting................................................................................................................................................................ 132
10.4 Battery Storage and Recharge..................................................................................................................................... 149
10.5 Storage with Low SOC................................................................................................................................................... 152
11 FAQs..................................................................................................................................... 154
11.1 Uneven Ground During the Installation...................................................................................................................154
11.2 Tools for Preparing PV Cables......................................................................................................................................154
11.3 Special Cables.................................................................................................................................................................... 154
11.4 Removing Power Terminals.......................................................................................................................................... 154
11.5 Power-On............................................................................................................................................................................ 155
Issue 03 (2022-10-28)
Copyright © Huawei Digital Power Technologies Co., Ltd.
vi

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isitepower-m isp-m-map05a1

Table of Contents