Usb Port As Service Port; Get Started With Web-Editor On Microbrowser Panel Pcd7.D4Xx - SBC PCD7.D4 Series Manual

Mb-panel
Table of Contents

Advertisement

Saia-Burgess Controls AG
1.7.8

USB Port as Service Port

This port commonly called the service port has multiple functions.
Its main use serves to make download of new FW program.
Another use consists to access the internal data for analyses. Future development
regarding download of SBC-Web pages is under consideration but no release date is
actually planned.
1.7.9

Get Started with Web-Editor on MicroBrowser Panel PCD7.D4xx

A detailled documentation can be downloaded on our Internet site.
See manual 26-838_Manual_Web-Editor.
In order to get into the programming with our MB-Panel, there are some little dedi-
cated adjustment that we have to pay attention:
■ When starting as new Project, and so long no Wizard help is at disposal, you have
to setup your project as follow:
■ Using virtual Keyboard with QVGA MB-Panels
Two ways are possible according to the "order of file search" option
1)
No local file search
If you use the virtual Keyboard insert in the project the files alphapad.teq and
keypad.teq. In this case. ( this files are in the Local server of the MB-Panel un-
der INTFLASH/WEBPAGES or under Web-editor/MBQVGATeqlib or MBVGATe-
qlib ) Copy them in the web-editor project.
2)
Local file search before remote
This option allows using the Virtual keyboard without inserting the alphapad.teq
and keypad.teq.in the project
■ Using virtual Keyboard with VGA MB-Panels
See the chapter 5.11 keyboard
■ QVGA MB-Panels: The preloaded Messagebox.teq, used as error Message listing,
has to be resize to our Panel Pixel size. Set it to 320×240 pixels.
■ If you want to use a file background.teq or foregroung.teq, start creating
those files at first. Why? to view correctly where your object or text/field that will
always(or often) be displayed are positioned on every page.
■ Once your project is ready for downloading, generate the html file name you desire
and make a Build Project. Afterwards in the Saia PG5 Project Manager you have
to make a Webserver Build for having all the project files in the PLC. HERE, if you
just want to access the PLC with MB-Panel PCD7.D4xx and not with a PC Brows-
er, you can reduce the amount of data to download by removing the *.jar file as
the panel includes it already.
Manual PCD7.D4xx │  D ocument 26-851 ENG12  │   2 016-02-05
Quickstart
Communication
1
1-15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pcd7.d435 seriesPcd7.d457 seriesPcd7.d410vtcf

Table of Contents