Additional Information For A New Transport Of The Machine; Checking The Lifting Device - Index G300.2 Operating Instructions Manual

Table of Contents

Advertisement

RElOCATION

Additional information for a new transport of the machine

Transport, Installation, Commissioning
G300.2 G320.2 (turning length 1400 mm) zero series
DIE235EN - 2022-12-05
Additional information for a new transport of the
machine
Before transporting the machine again, be sure to read Chapter
"Transporting the machine" and Section "Location of the transport
locks ....".
All transport locks and transport devices must be mounted. The as-
semblies may have to be moved to a defined position in order to be
able to mount the transport locks.
When assembling the lifting device, be careful not to damage the
ballscrew or the glass scale.
The tightening torque of 300  Nm for the screws (M36) of the lifting
device must be strictly observed.
DIE235ZZ_29.tif

Checking the lifting device

Before re-use, be sure to check and
evaluate the entire transport gear
(visual inspection).
In the event of obvious damage
such as deformation or cracks, it
must no longer be used.
Fig.:
View of lifting device equipment as a whole –
with turnbuckle
49

Advertisement

Table of Contents
loading

This manual is also suitable for:

G320.2

Table of Contents