TRANSPORT
locations of the transport locks on the machine
Transport, Installation, Commissioning
G300.2 G320.2 (turning length 1400 mm) zero series
DIE235EN - 2022-12-05
Transport lock of tool carrier
Tool carrier 1 (TC* top)
Before attaching the transport locks, the tool carriers were moved to the following
positions:
The tool carriers are located at defined positions and are secured
there with the transport locks.
If the machine is at the installation site, the transport locks must be
removed before commissioning.
Before a new transport/change of location, the tool carriers must be
moved back to the defined positions, and the transport locks must
be installed.
X
DIE235ZZ_17.tif
Z
DIE235ZZ_18.tif
DIE235ZZ_16.tif
Y motor milling spindle (MMS)
(*TC = tool carrier)
TC1
X
0
Y
-45
Z
780
33