Commissioning; Cleaning The Machine; Check The Operating Fluid Levels And Replenish, If Necessary - Index G300.2 Operating Instructions Manual

Table of Contents

Advertisement

COmmISSIONING

46
Commissioning
This section lists all the actions that must be carried out in the order given before
the machine is ready for start-up.
Only then is the machine ready for operation.
Before commissioning the machine, unscrew all transport locks
(recognizable by their red color) and keep them for another trans-
port in the future.
Refer to Section "Location of transport locks".

Cleaning the machine

All blank parts of the machine were treated by spray-covering with an anti-rust
agent. Usually this protective cover is flushed away by the cooling lubricant during
the operation of the machine.
To prevent solvent splashes from entering the eyes when
cleaning the machine, be sure to wear suitable safety goggles.
For cleaning the inside of the machine's work area, protect
your hands and arms by wearing clothes with long sleeves and
suitable gloves.
Risk of injury by sharp machine parts and cutting edges!
The anti-rust agent must be washed off if the machine is put into operation after a
long time and the protective layer has become very tough.
The mounting surfaces for tool holders and add-on equipment must also be
cleaned.
For this purpose, only solvents may be used that do not affect the machine paint.
Suitable solutions are turpentine, petroleum, or benzene.
Check the operating fluid levels and replenish, if
necessary.
Hydraulic system: .......................................................... Fluid level check
Cooling lubricant unit: .................................................... Replenish cooling lubricant
Central lubrication system: ........................................... Fluid level check
Add-on equipment: ........................................................ Fluid level check
Cooling: ........................................................................... Level check
For information on the lubricating oil, hydraulic fluid, cooling lubricant,
and coolant grades, as well as on volumes and filling positions, see
plan in Chapter 1, Instructions: "Information on operating materials"
and "Hydraulic diagrams" and "Machine installation plan" (Chapter 2,
"Diagrams and drawings").
Transport, Installation, Commissioning
G300.2 G320.2 (turning length 1400 mm) zero series
DIE235EN - 2022-12-05