PREPARATIONS

Suitable transporting and lifting aids

Transport, Installation, Commissioning
G300.2 G320.2 (turning length 1400 mm) zero series
DIE235EN - 2022-12-05
Preparations
This section is addressed to the persons responsible for the installation and their
staff.
The information provided here allows you to prepare the installation site and its
surroundings such that the machine, when delivered, can be installed and put into
operation immediately.
Be sure to carefully plan the delivery, unloading, and transporting of the machine
from the unloading site to the installation site.
The installation plan applicable for this machine was already submit-
ted for approval after the contract award. When the machine is deliv-
ered, it can be found in Chapter 2, "Diagrams and drawings" on the
supplied data carrier and the controller (iXpanel installation required).
Take the size (dimensions) and masses of each unit into consideration.
Suitable transporting and lifting means must be available when the machine is deliv-
ered.
Any obstacles along the transport route from the unloading site to the installation
site must be eliminated before the machine is delivered.
Check the transport route for load capacity, levelness, damaged pavement, traverse
grooves, slopes, gradients, etc.
Is the width and height of entrances and gates sufficient?
If elevators are to be used, do they have sufficient capacities?
Proper planning will pay off!
Suitable transporting and lifting aids
Suitable transporting and lifting means must be available when the machine is deliv-
ered:
– Crane
– Truck-mounted crane
– Forklift (only for separate units)
– Transport trolley
– Transport rollers
– Air cushion
– Armored rollers
– Hydraulic jacks
– Forklift truck (only for separate units).