Start-Up And Operation - KEB COMBIVERT F6 Series Instructions For Use Manual

Installation f6 housing 2 peak power standard ol-function
Hide thumbs Also See for COMBIVERT F6 Series:
Table of Contents

Advertisement

bASIC SAFETy INSTRUCTIONS

1.5 Start-up and operation

The drive controller must not be started until it is determined that the installation com-
plies with the machine directive; Account is to be taken of
WARNING
CAUTION
NOTICE
18
Software protection and programming !
Hazards caused by unintentional behavior of the drive!
► Check especially during initial start-up or replacement of the drive
controller if parameterization is compatible to application.
► Securing a unit solely with software-supported functions is not suf-
ficient. It is imperative to install external protective measures (e.g.
limit switch) that are independent of the drive controller.
► Secure motors against automatic restart.
High temperatures at heat sink and coolant!
burning of the skin!
► Cover hot surfaces safe-to-touch.
► If necessary, attach warning signs on the system.
► Before touching, check the surface and coolant lines.
► Before working let the unit cool down.
During operation, all covers and doors shall be kept closed.
Use only approved accessories for this device.
Never touch terminals, busbars or cable ends.
If a drive controller with electrolytic capacitors in a DC link
has not been in operation for more than one year, observe
the following instructions.
https://www.keb.de/fileadmin/media/Techinfo/dr/tn/ti_dr_tn-format-capaci-
tors-00009_en.pdf
Continuous operation (S1) with load > 60 % or
from a rated motor power of 55 kW !
Premature ageing of the electrolytic capacitors !
► Mains choke with U
EN
60204-1.
= 4% absolutely necessary.
k

Advertisement

Table of Contents
loading

Table of Contents