5 Transport, Packaging and Storage ........12 30 CG IV.1 Relay Module .............68 5.1 Transport inspection ..........12 31 CG V.1 Relay Module ............69 5.2 Packing ..............12 32 F3-Remote Control AP and UP ........70 5.3 Storage ..............13 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 3
Appendix D: Position plans of the luminaires ....141 Appendix E: Installation examples Monitoring Modules ........142 Appendix F: Test and inspection protocol for emergency lighting systems .......143 General Safety instructions - Batterys ......144 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
INTERSEROH GmbH. The contract number is 85405. This of these components. guarantees that all registered packaging material is reused and all the requirements of the Packaging Ordinance are fulfilled Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
DualGuard-S devices meet the requirements of EN62034, stood, “Automated testing systems for battery-operated safety lighting, ” and are classified as Typee PERC. • the activities are carried out under the supervision and control of competent personnel. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
IATA: The International Air Transportation Association (world- ATTENTION! PHYSICAL DAMAGE! wide) The battery can be damaged or destroyed by improper ICAO: Civil Aviation Organization’s Technical Instructions for transportation. the Safe Transport of Dangerous Goods b Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
The stacking of pallets or devices is not permitted. Avoid storing unpackaged blocks on surfaces with sharp edges. It is recommended that the same Typee of storage conditions be provided for separate batches, pallets or rooms. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
20 °C. • Higher temperatures reduce the design Above 40 °C there is a risk of the „thermal runaway effect“ . Lower temperatures reduce available capacity and extend recharge time. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
A - 28 x 6.72 m3/h A - 188,21 cm2 The required ventilation openings in the F90 walls are to be secured in terms of building protection, e.g. by: F90 fire dampers. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
100 Ah line capacity and at the smallest possible distance. • M6 threaded hole: 11 ± 1 Nm • Each string has a fuse. • M8 threaded bolt: 8 ± 1 Nm Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Atng switched on again. Always wear the battery when working on and with it: • Safety shoes for protection against heavy falling parts and slipping on non-slip surfaces. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
5.2 Packing If no return agreement has been made for the packaging, separate materials by Typee and size and return them for further use or recycling. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Secure all cable inlets and outlets of the DualGuard-S cabi- net against mechanical damage to the cables or moisture ingress using the M cable glands or rubber seals provided for this purpose. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 14
Install, install and connect the lighting equipment in accor- dance with the relevant electrical engineering directives and standards. In addition, observe all directives and regulations of the country in which the system is installed and operated. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 15
Ensure that the cables have a conductor cross-section that is suitable for the expected current flows to the connected loads. Only one temperature sensor (F+ / F-) and up to four battery Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 16
Connect the cables for the battery power supply of the DualGuard-S switch cabinet: Make sure that the system and the supply lines are discon- nected! Connect the positive conductor to the positive terminal of the switch-disconnector. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 17
Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 18
The assignment of the circuit numbers used in the touch display and the displayed switching outputs of the SKU.1s is made by selecting the slots on the subracks. Replaced SKU.1s must be re-registered via the touch display. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
7 Installation example DualGuard-S 7 Installation example DualGuard-S Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
CG IV.1/V.1 CM.1 1,7A L/N 250 V Relaismodul RS485 SKU.1 CG-S 4x1,5 A Baugruppenträger Stromkreismodule CM 3,4 A Baugruppenträger Lademodule CCB-Bus BBS. BDM. Batterieblock Batterie Data Modul für separate Montage Sensoren Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
NOTE! By bridging L / N or U1 / 01 ( ... ), active components of the electronics and the luminaires (-EVGs) are protected against possible destruction! Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Only then do you switch on the battery power supply otherwise the error display on the at the battery bank. touch display will be activated. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
The systems and luminaires are supplied ex works in such a way that the emergency lighting function is guaranteed even without customer-specific configuration. Configuration of the national language By touching the icon the desired language can be set. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 24
Further recommendations on practices are described in an EATON white paper „Cybersecurity considerations for electrical distribution systems“ , which can be downloaded as a PDF file with a search engine under the search term „WP152002EN“ . Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 25
After entering, press key > OK <. Then press any field. If the EATON password entered at the factory is to be retained, click on the „Retain password“ icon. If a new password is to be assigned, click on the „Change pass- word“...
Page 26
Get service information. o Load and save device configuration via - Charging Config - Memory Config - Copy Config to USB - Copy Config from USB • Start FT Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 27
ISO Troubleshooting Basic settings o Lade/Battery Setting o Test Settings o General settings - System Settings o Log book • Circuit Setup • Luminaire setup • I/O Modul Setup Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 28
Charging/Battery Setting o Test Settings o General settings - System Settings - Timer Settings - HMI Settings • Log book • Circuit Setup • Luminaire setup • I/O Modul Setup Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 29
- Timer Settings - HMI Settings - User Settings o Log book o ACU settings o PSU Settings o GLT Settings • Circuit Setup • Luminaire setup • I/O Modul Setup Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 30
Entries of the nominal capacity, num- Battery settings ber of battery blocks, cells per block and the float charge voltage Icon Battery information such as type, order General Settings number, etc. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 31
Use the arrow keys to enter the start start time time, time and distance between two Duration test tests. time start time Duration test Distance between tests Icon Test setup Icon for automatic Actuate function test Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 32
Use the arrow key to set device address 1-128. Manual reset Actuate Selective Actuate emergency light Emergency lighting Use the arrow key to enter the time. Icon Log book Actuate Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 33
Ready light = All lights are switched To configure the off and switch on automatically at circuit type of the power failure. circuit. Permanent light= All lights are on continuously. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 34
Per Leuchtensetup was previously selected as the circuit type for the circuit. Icon Luminaire Actuate Icon General Name, Informati- on, W and VA. Free text can be entered. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 35
Icon GLT Switch= switches. Luminaire switches on via LON switch. Icons Timer= luminaire switches on via programmed TimerFunction. Icon IO/3PM-IO/TLS= Luminaire swit- ches on via separate I/O modules. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 36
Icon Information „Closed room. Bring a key“ . Icon Input Name Assign the input name Icon Actuate to There can be up to the inputs a text. 8 inputs available. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 37
Select the event icon and assign it to and Summer. the relay / buzzer. At Actuate is reset to factory setting. Icon Default Values Load Special configuration for Deutsche Bahn Icon DB-FUB Icon Inputs Set- Actuate tings Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 38
- fan monitoring - Ext. ISO Monitor - Ext. Battery Monitor - Ect. Monitor - All Luminaires - AE Szenario active - AE disruption - power outage UV Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 39
Ope- Icon Function Entries rating steps Icon Menu Actuate Icon Basic settings Actuate Icon PSU Settings Actuate Icon PSU 1-5 Select the PSU icon to be configured. Settings Icon Serialnr: Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 40
General Settings Actuate. User Settings Actuate. Network Settings Actuate. The informati- Expert knowledge in dealing with on about the IP networks necessary. address, subnet, gateway, etc. comes from the IT department. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 41
16.9. Table Set Up Web Server (Login Expert) Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 42
Expert knowledge in dealing with Icon Username networks necessary. Icon Password Icon Keep Alive Time Icon Connect Broker Icon fault Icon switch enab- Actuate ling BMS Icon switch 1 - 16 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 43
Press a free field in the „Name“ co- users different lumn. Then click the Actuate icon. groups can be created to limit the access rights. Note! The user group Admin should not be changed or deleted. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 44
The status is displayed on the HMI after the function test. If faults are displayed, they must be rectified and the function test repea- ted. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 45
DC fuse error Backup error AC ISO+ error ISO error communication error battery interruption Luminaire fault DC Luminaire fault AC I< Imin DC I< Imin AC IGBT error Supply voltage inverted. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 46
Nominal power in W Nominal power in VA IO/3PM-IO/TLS Status Selection of which module requires a status. ACU Status Actuate ACU Status Type: Software: Hardware: Information Information for the Service Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 47
16.13. Table troubleshooting (Login Operator) Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
SKU.1.1 CG-S. With these substations, the charging techno- logy of the connected battery emergency power supply is not required; the battery and mains power supply is provi- ded via the DualGuard-S system. DualGuard-S 20C6 DualGuard-S 12C6 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 49
Safety and escape sign DualGuard-S ESF15-P DualGuard-S ESF30-P luminaires with automatic monitoring. DualGuard-S ESF SOU5 DualGuard-S ESF SOU3 DualGuard-S ESF SOU2 DualGuard-S ESF SOU1 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
(1-15 min.), selective emergency light, LON switch, timer function, automatic function and operating time test, selection of menu language, automatic summer time set- tings, password protection Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 51
Directly on the color touch screen. Order details Type Description Order No. HMI Modul 4,3" 4.3" colour touch for door installation 40071361640 HMI Module 7" 7" colour touch for door installation 40071361650 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Control Modul for DIN rail mounting 40071361600 ACU DG terminal assignment Relais 1 Relais 3 Termination ACU CAN BUS Termination RS 485 BUS Relais 2 Relais 4 RS 485 BUS Ext. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 53
20 ACU DG Modul Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 54
Switch all luminaires to non-main- tained light Switch a defined group of lumi- naires for maintained lighting Scenario active Malfunction of the technical ventila- tion of the battery room Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 55
Faults (red LED): The device function is disturbed. Scenario active (orange LED): An evacuation was triggered via the AE-CU controller. Service Pin: To login and logout the ACU DG module. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 56
- it is not permitted to bandle several data lines within one shielded line! The 120Ω Ohm terminating resistor is integrated in the ACU DG modules and can be activated by a DIL switch. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
The PSU module is powered by the 216V battery and the 250V AC module. Ordering details Type Description Order No. PSU Module Power supply module for rack mounting 40071361590 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
(Mains): 250AC Input voltage AC ACU CAN / LON Bus IN Module 220 ... 240V AC Frequency: 50 or 60Hz ACU CAN / LON Bus OUT Potential-free contact PSU OK Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
SELV. This means that the cabling to the connected systems must at least be single insulated, in addition the power supply (24V/0.5A) must at least be single insulated from mains or battery. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 61
Temperature sensor: An Shunt connectors, I3+ external temperature sen- sor must be connected to terminals T + and T-. Shunt connectors, I2 + Shunt connectors, I1/2- Shunt connectors, I1+ Terminals CCB +/-, Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 62
LED ISO Failure: The ISO fault LED lights up red if there is an insulation fault in the battery circuit. Strang 1 Strang 2 Strang 3 Strang 4 BCM.1 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
The LEDs indicate the operating status of the charging module. Ready for operation (LED lights up). Ordering details Type Description Order No. CM 3,4A Charge module 3.4A for rack mounting 40071360370 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Typical switching over time: AC to DC = 450 ms Ordering details Type Description Order No. SKU.1.1 CG-S 4 x 1,5A Circuit switching 4 x 1.5A for Snap subrack Moun- 40071361550 ting Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Typical switching over time: AC to DC = 450 ms Ordering details Type Description Order No. SKU.1.1 CG-S 2 x 3A Circuit switching 2 x 3A for Snap subrack Mounting 40071361560 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Typical switching over time: AC auf DC = 450 ms Ordering details Type Description Order No. SKU.1.1 CG-S 1 x 6A Circuit switching 1 x 6A for Snap subrack Mounting 40071361570 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
10 TE (10 and 17 ,8 mm) Ordering details Type Description Order No. SOU CG-S 2 x 4A Circuit switching over module 2 x 4A for DIN rail 40071360430 mounting. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Battery duration test ON => 24V DC ≥ 20ms Battery duration test OFF => 24V DC ≥ 20ms Ordering details Type Description Order No. CG IV.1 Relay module for subrack Mounting 40071361620 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Battery duration test ON => 24V DC ≥ 20ms Battery duration test OFF => 24V DC ≥ 20ms Ordering details Type Description Order No. CG V.1 Relay module for subrack Mounting 40071361630 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
LED displays L1, L2, L3: Grün = Keine Störung Test button: Zum Simulieren einer Netzstörung. Ordering details Type Description Order No. 3-PM Module Phase monitor module for DIN rail mounting 40071361660 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Terminals Connection cross-sections: 0.2-2.5 mm² rigid/flexible Ordering details Type Description Order No. 3-PM-IO-INV Module Phase monitor / light switch interrogation Bus mo- 40071361680 dule for DIN rails Mounting with inverted inputs Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 74
- it is not permitted to bundle several data cables within one shielded cable! The 120 Ohm terminating resistor is integrated in the modules and can be activated by a bridge at terminals B1/B2. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 75
35 3-PM-IO-INV Module Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 77
Mains distribution board: 16 mm² Rigid/flexible Order number accesories: Cupboard base 100mm 40071362282 Cupboard base 200mm 40071362283 Door hinge left 40071362301 Special locking profile half cylinder 40037079790 IP 31 Retrofit kit 40071362291 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 78
Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 79
Mains distribution board: 16 mm² Rigid/flexible Order number accesories: Cupboard base 100mm 40071362282 Cupboard base 200mm 40071362283 Door hinge left 40071362301 Special locking profile half cylinder 40037079790 IP 31 Retrofit kit 40071362291 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 83
16 mm² Rigid / 16 mm² flexible Order number accesories: Cupboard base 100mm 40071362282 Cupboard base 200mm 40071362283 Door hinge left 40071362301 Special locking profile half cylinder 40037079790 IP 31 Retrofit kit 40071362296 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 84
Order Number wiring set: 40071346779 15 x Length 1: 300 mm 2 x Length 2: 1000 mm 1 x Length 3: 800 mm 1 x Length 4: 2000 mm 3. Battery console Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 85
Order Number wiring set: 40071347446 13 x Length 1: 360 mm 5. Battery console 4 x Length 2: 800 mm 1 x Length 3: 800 mm 1 x Length 4: 2000 mm Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 86
13 x Length 1: 440 mm 4. Battery console 4 x Length 2: 800 mm 1 x Length 3: 800 mm 1 x Length 4: 2000 mm 5. Battery console Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 87
13 x Length 1: 350 mm 4. Battery console 4 x Length 2: 800 mm 1 x Length 3: 800 mm 1 x Length 4: 2000 mm 5. Battery console Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 88
Order Number wiring set: 118 Ah: 40071346775 26 x Length 1: 350 mm 8 x Length 2: 800 mm 5. Batteriekonsole 5. Batteriekonsole 2 x Length 3: 800 mm 2 x Length 4: 2000 mm Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 89
Order Number wiring set: 89,4Ah: 40071360230 13 x Length 5: 350 mm 5. Batteriekonsole 5. Batteriekonsole 4 x Length 6: 800 mm 1 x Length 7: 800 mm 1 x Length 8: 2000 mm Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 90
Order Number wiring set: 89,4Ah: 40071360230 13 x Length 5: 350 mm 4 x Length 6: 800 mm 1 x Length 7: 800 mm 1 x Length 8: 2000 mm Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 91
13 x Length 5: 350 mm 4 x Length 6: 800 mm 4. Batteriekonsole 4. Batteriekonsole 1 x Length 7: 800 mm 1 x Length 8: 2000 mm 5. Batteriekonsole 5. Batteriekonsole Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 92
Order Number wiring set: 89,4Ah: 40071360230 13 x Length 5: 350 mm 4 x Length 6: 800 mm 1 x Length 7: 800 mm 1 x Length 8: 2000 mm Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 93
13 x Length 5: 350 mm 5. Batteriekonsole 5. Batteriekonsole 5. Batteriekonsole 4 x Length 6: 800 mm 1 x Length 7: 800 mm 1 x Length 8: 2000 mm Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 97
35 mm² Rigid/35 mm² flexible Order number accesories: Cupboard base 100mm 40071362282 Cupboard base 200mm 40071362283 Door hinge left 40071362303 Special locking profile half cylinder 40037079790 IP 31 Retrofit kit 40071362293 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 98
Order Number wiring set: 40071346779 15 x Length 1: 300 mm 2 x Length 2: 1000 mm 1 x Length 3: 800 mm 1 x Length 4: 2000 mm 3. Battery console Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 99
12 x Length 1: 300 mm 3 x Length 2: 440 mm 2 x Length 3: 700 mm 1 x Length 4: 300 mm 3. Battery console 1 x Length 5: 1200 mm Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 100
12 x Length 1: 300 mm 3 x Length 2: 440 mm 2 x Length 3: 700 mm 1 x Length 4: 300 mm 3. Battery console 1 x Length 5: 1200 mm Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 101
41 DualGuard-S 12C Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 103
35 mm² Rigid/35 mm² flexible Order number accesories: Cupboard base 100mm 40071362284 Cupboard base 200mm 40071362285 Door hinge left 40071362302 Special locking profile half cylinder 40037079790 IP 31 Retrofit kit 40071362292 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 105
Mains distribution board 35 mm² Rigid/35 mm² flexible Order number accesories: Cupboard base 100mm 40071362284 Cupboard base 200mm 40071362285 IP 31 Retrofit kit 40071362297 Door hinge left 40071362306 Special development 40037079790 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 106
Order Number wiring set: 40071346779 15 x Length 1: 300 mm 2 x Length 2: 1000 mm 1 x Length 3: 800 mm 1 x Length 4: 2000 mm 3. Battery console Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 107
12 x Length 1: 300 mm 3 x Length 2: 440 mm 2 x Length 3: 700 mm 1 x Length 4: 300 mm 1 x Length 5: 1200 mm 3. Battery console Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 108
12 x Length 1: 300 mm 3 x Length 2: 440 mm 2 x Length 3: 1000 mm 1 x Length 4: 400 mm 1 x Length 5: 1400 mm 3. Battery console Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 109
12 x Length 1: 300 mm 3 x Length 2: 360 mm 2 x Length 3: 1500 mm 1 x Length 4: 400 mm 1 x Length 5: 1800 mm 3. Battery console Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 111
Mains distribution board 16 mm² Rigid/flexible Order number accesories: Cupboard base 100mm 40071362280 Cupboard base 200mm 40071362281 Door hinge left 40071362300 Special locking profile half cylinder 40037079790 IP 31 Retrofit kit 40071362290 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 112
Order Number wiring set: 40071346005 15 x Length 1: 240 mm 2 x Length 2: 900 mm 1 x Length 3: 600 mm 1 x Length 4: 1300 mm 3. Battery console Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 113
Order Number wiring set: 40071346779 15 x Length 1: 300 mm 2 x Length 2: 1000 mm 1. Battery console 1 x Length 3: 800 mm 1 x Length 4: 2000 mm Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Sheet steel compact cabinet with cable entry from above, HMI touch display installed in the door, ACU DG Controller, BCM.1 charge and insulation monitor and battery string monitoring module, PSU power supply module. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 116
IP21 Order Number wiring set: 40071346005 15 x Length 1: 240 mm 2 x Length 2: 900 mm 1 x Length 3: 600 mm 1 x Length 4: 1300 mm Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 117
IP21 Order Number wiring set: 40071360242 15 x Length 1: 240 mm 2 x Length 2: 900 mm 1 x Length 3: 600 mm 1 x Length 4: 1300 mm Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
ECG / LED supply module including monitoring module without additional data line also reports and logs the operating status of the external phase monitor modu- les. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 119
Mains through-wiring 35 mm² Rigid/flexible Order number accesories: Cupboard base 100mm 40071362282 Cupboard base 200mm 40071362283 Door hinge left 40071362301 Special locking profile half cylinder 40037079790 IP 31 Retrofit kit 40071362291 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
ECG / LED supply module including monitoring module without additional data line also reports and logs the operating status of the external phase monitor modu- les. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 121
Mains through-wiring 35 mm² Rigid/flexible Order number accesories: Cupboard base 100mm 40071362282 Cupboard base 200mm 40071362283 Door hinge left 40071362301 Special locking profile half cylinder 40037079790 IP 31 Retrofit kit 40071362291 Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 122
ECG / LED supply module including monitoring module without additional data line also reports and logs the operating status of the external phase monitor modu- les. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
ECG / LED supply module including monitoring module without additional data line also reports and logs the operating status of the external phase monitor modu- les. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
ECG / LED supply module including monitoring module without additional data line also reports and logs the operating status of the external phase monitor modu- les. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Physical security is an important layer of defense in such cases. DualGuard-S is designed to be deployed and operated in a physically secure location. Following are some best practices that Eaton recommends to physically secure your system: - Secure the facility and equipment rooms or closets with access control mechanisms such as locks, entry card readers, guards, man traps, CCTV, etc.
Page 137
DualGuard-S supports network communication with other devices in the environment. This capability can present risks if it’s not configured securely. Following are Eaton recommended best practices to help secure the network. Additional information about various network protection strategies is available in Eaton Cybersecurity Considerations for Electrical Distribution Systems [R1].
Page 138
It is a best practice to purge data before disposing of any device containing data. Guidelines for decom- sation missioning are provided in NIST SP 800-88. Eaton recommends that products containing embedded flash memory be securely destroyed to ensure data is unrecoverable.
Terminal = output terminal of final circuit. Terminal designation scheme The assignment of the terminal blocks to the subracks 1 to 5 results from their arrangement from left to right. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
At Verwendung von Standard-EVGs muss sichergestellt sein, dass eine einwandfreie Function des EVGs auch im DC-Spannungsbereich von 186 V to 275 V gewährleistet ist. Wir empfehlen, eine entsprechende Bescheinigung des Herstellers einzuholen. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
• Akumulatori se moraju upotrebljavati u skladu sa • Atjungiant tokiomis sąlygomis arba susidarius αντικατάσταση. • Die Batteryn sind nicht für den privaten Gebrauch svojom namjenom u ispravnom i neoštećenom trumpajam jungimui atsiranda elektros lankas, geeignet. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 145
• Utilizați numai piese de schimb originale. • Vær oppmerksom på fallende deler ander transport. .ال تستخدم إال قطع الغيار األصلية لغرض االستبدال • Akkuja on käytettävä niiden tarkoitettuun käyttö- Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 146
• Χρησιμοποιείτε μόνο γνήσια ανταλλακτικά για • N’utilisez que des pièces de rechange d’origine kredsløbene ander belastning. αντικατάσταση. en cas de remplacement. • Pas på løsdele ander transport. • Brug kun originale reservedele ved udskiftning. Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 147
• Laitteita on käytettävä niiden tarkoitettuun første gangs bruk. käyttötarkoitukseen asianmukaisessa ja • Ved arAtd med enhetene, skal strømmen først vahingoittumattomassa kunnossa. slås helt av, og det skal sikres at den ikke kan Mounting- and Operating Instruction CEAG DualGuard-S 40071860347 January 2020 www.ceag.de...
Page 148
At Eaton, we’re energized by the challenge of powering a world that demands more. With over 100 years experience in electrical power management, we have the expertise to see beyond today. From groundbreaking products to turnkey design and engineering services, critical industries around the globe count on Eaton.