Lenovo 5458 Installation And Service Manual page 484

Table of Contents

Advertisement

166-824-001 • 166-907-001
Serviceable: Yes
Recoverable: No
Automatically notify Support: No
User response: Perform the actions mentioned one at
a time and try the test after each action:
1. Turn off the system and disconnect it from power.
Wait for 45 seconds. Reconnect it to power.
2. Make sure that DSA and BMC/IMM are at the
latest level.
Related Links:
IBM Support Website
v
Latest level of DSA
v
Latest level of BMC/IMM
v
166-824-001
IMM I2C Test Aborted
Explanation: Cannot execute command.
Severity: Warning
Serviceable: Yes
Recoverable: No
Automatically notify Support: No
User response: Perform the actions mentioned one at
a time and try the test after each action:
1. Turn off the system and disconnect it from power.
Wait for 45 seconds. Reconnect it to power.
2. Make sure that DSA and BMC/IMM are at the
latest level.
Related Links:
IBM Support Website
v
Latest level of DSA
v
v
Latest level of BMC/IMM
166-901-001
IMM I2C Test Failed
Explanation: IMM Indicates failure in RTMM bus
(BUS 0).
Severity: Error
Serviceable: Yes
Recoverable: No
Automatically notify Support: No
User response: Perform the actions mentioned one at
a time and try the test after each action:
1. Turn off the system and disconnect it from power.
Wait for 45 seconds. Reconnect it to power.
2. Make sure that DSA and BMC/IMM are at the
latest level.
3. Run the test again.
468
System x3250 M5 Type 5458: Installation and Service Guide
4. If failure remains, refer to "Troubleshooting by
symptom" in the system "Installation and Service
Guide" for the next corrective action.
Related Links:
IBM Support Website
v
Latest level of DSA
v
Latest level of BMC/IMM
v
166-904-001
IMM I2C Test Failed
Explanation: IMM Indicates failure in
PCA9543--2-Channel I2C Switch bus (BUS 3).
Severity: Error
Serviceable: Yes
Recoverable: No
Automatically notify Support: No
User response: Perform the actions mentioned one at
a time and try the test after each action:
1. Turn off the system and disconnect it from power.
Wait for 45 seconds. Reconnect it to power.
2. Make sure that DSA and BMC/IMM are at the
latest level.
3. Run the test again.
4. If failure remains, refer to "Troubleshooting by
symptom" in the system "Installation and Service
Guide" for the next corrective action.
Related Links:
IBM Support Website
v
v
Latest level of DSA
Latest level of BMC/IMM
v
166-907-001
IMM I2C Test Failed
Explanation: IMM Indicates failure in the PCA9545
--failure in 4-Channel I2C Switch bus (BUS 6).
Severity: Error
Serviceable: Yes
Recoverable: No
Automatically notify Support: No
User response: Perform the actions mentioned one at
a time and try the test after each action:
1. Turn off the system and disconnect it from power.
Wait for 45 seconds. Reconnect it to power.
2. Make sure that DSA and BMC/IMM are at the
latest level.
3. Run the test again.
4. If failure remains, refer to "Troubleshooting by
symptom" in the system "Installation and Service
Guide" for the next corrective action.
Related Links:

Advertisement

Table of Contents
loading

Table of Contents