Transistor Tests
Testing the IGBTs, output circuit measurement
Positive Side
Negative lead of meter to positive DC terminal.
Positive lead of meter to U/V/W terminals.
Multimeter
Negative Side
Positive lead of meter to negative DC terminal.
Negative lead of meter to U/V/W terminals.
Testing the braking circuit
Positive Side
Negative lead of meter to positive DC terminal.
Positive lead of meter to PB terminal.
Negative Side
Positive lead of meter to negative DC terminal.
Negative lead of meter to PB terminal.
134
-
+ + +
+
-
Multimeter
-
+
Multimeter
+
-
Multimeter
Measurement
+ Terminal
+ Terminal
+ Terminal
Measurement
+ Terminal
+ Terminal
+ Terminal
-
-
Measurement
+ Terminal
Measurement
+ Terminal
Measurement
+ Terminal
Measurement
+ Terminal
E, G, and H Housings
To
Value
Measurement
U
0.3 - 0.4
- Terminal
V
0.3 - 0.4
- Terminal
W
0.3 - 0.4
- Terminal
R, U, and W Housings
To
Value
Measurement
U
0.2 - 0.4
- Terminal
V
0.2 - 0.4
- Terminal
W
0.2 - 0.4
- Terminal
E Housing
To
Value
Measurement
PB
0.4
- Terminal
G Housing
To
Value
Measurement
PB
0.4
- Terminal
H Housing
To
Value
Measurement
PB
0.3
- Terminal
R, U, and W Housings
To
Value
Measurement
PB
0.3
- Terminal
To
Value
U
0.3 - 0.4
V
0.3 - 0.4
W
0.3 - 0.4
To
Value
U
0.2 - 0.4
V
0.2 - 0.4
W
0.2 - 0.4
To
Value
PB
Open
To
Value
PB
1.5
To
Value
PB
0.3
To
Value
PB
0.3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents