System Arrival, Inspection and Placement

An acceptable site must be prepared prior to the installation of the 5DX
System. This includes having a level floor capable of supporting 3630 kg
(>7600 pounds), clearances for all equipment, power and air utilities and
acceptable climate control. Movement to the final location should be
considered before transportation. Make sure there is a travel route with
sufficient access clearances throughout the course of movement (this
includes the turning radius for the 5DX and the forklift).
Agilent 5DX Installation
Notes
Agilent PN E7200-67917
10, 15, 20, 25 sizes
Continuity "beep" is useful
25 cm (10 inch) minimum
6"
Victoreen 440 RF/D
Victoreen 290 GM, etc.