Figure 7
Inner Barrier Bracket
Check X-ray Tower
4.
shipped with the system. Check the SF
40psi, and should be 55-65psi. Verify all cords are firmly seated in
their connections. Two bolts in the tower door are designed to prevent
damage during shipment and to reduce vibration during high speed
stage movement.
Electronics Bay Setup
5.
the bay door keys. Unlock the front door for accessibility. Remove the
light stack and install on top of the bay with the screws provided.
(This will require removal of the top of the electronics bay. You may
want to remove the doors at this time as well to facilitate access.)
Attention
Assemblies within the electronics bay are susceptible to
electrostatic discharge. Be sure to properly ground yourself
before handling any assemblies.
Agilent 5DX Installation
Remove the inner barrier
brackets by removing the three
screws (each bracket) securing
them to the frame.
Screw locations: use a
9/64 hex wrench for the
ones on the side and a
5/32 for the top one.
— Open the tower door with the T-handle that
6
pressure. It must be above
— Open the rear door of the bay and locate