At the prompt, enter
c.
number is the width of the confirmation panel in mils (1 mil equals
Ø.ØØ1 inches).
NOTE
It is recommended you use the value for the newer Confirmation
and Adjustment board (E7200-90039) for installation. This
board uses the 11450 value. If there is not a newer board
available, the older panel (E7200-60027) (Four Pi 403570-101)
will need to be used. If that is the case, use a value of 11950 here
and all other instances where this guide mentions the 11450
value.
Stage Rail Adjustment
4.
Panel Handling >
process if you need to.)
does not load or unload properly, adjustment will be required. You
should perform the steps below anyway.
Open the two sliding access panels on top of the main unit. Use
a.
calipers (or equivalent) to measure the distance between the fixed rail
and the adjustable rail for the main stage. The distance should be
11.480 (±0.005)
width at both ends of the rails to verify that they are parallel.
If this distance is incorrect then select
b.
System Access
• At the
directory.
• Type
width that requires correction. (This should be the line with
"@Mach_MainHomeWidth"
• After editing, press
to exit the file.
32
11450
— After the board has loaded, unload it using
Unload Panel.
If the confirmation and adjustment board
inches (11.980 for the older panel). Measure the
menu.
DOS
prompt type
vs machine.cfg
ALT
(see note below) and press
(Press Esc to abort the load
Quit from 5DX
and press
Enter
ca
and edit the appropriate home
w
to save the changes then press
. This
Enter
under the
to go to the
Calib
ALT