Panel Handling Subsystem Verification

NOTE
All main cabinet access panels must be closed and the green and
red interlock LEDs lighted on the operator control console.
NOTE
When installing a Pay Per Use system, remember to use Agilent
CE test credits during all panel handling verification, so as not to
use customer credits during this setup phase.
Verify Correct Load/Unload Configuration
1.
Left-to-Right. However, if the customer requires a Right-to-Left
configuration, a procedure must be followed to change the
configuration to Right-to-Left. This procedure is available in the
online documentation 5DX Service Guide. If it is required, do this
before you continue further. If not, proceed with the next step now.
Stage Alignment Verification
2.
Select
a.
pick list, choose 5DX_512. (The older panel uses
where xxx = the last three digits of the serial number of the machine).
From the
b.
Automatic. Load and unload the calibration board several times,
homing the rails after each load and unload iteration.
NOTE
On passback models, errors may occur. If so, perform
Panel Handling
• Verify that the load and unload cycle is consistent, and the
external barriers (doors) operate smoothly both in the open and
the closed directions.
30
Utilities > Load Panel Program
Utilities Menu,
to clear them.
— Check loading and unloading.
from the menu. From the
Panel Handling
select
— Standard systems are
4picalibxxx/sub
and choose
Reset
Agilent 5DX Installation