• Verify that the stage rails align to the production line rails for the
load and unload transitions (if this is an in-line installation).
Refer to the online Service Guide for troubleshooting.
Board in
Figure 17
Main Stage (top down view)
Verify Panel Handling System Operation
3.
width adjust: Only perform this step and the next step (
Rail Adjustment
proceed to
Select
a.
Select
b.
Agilent 5DX Installation
R
DB
PASS BACK
OS
PASS THROUGH
DB
W
R
) if you have problems loading a panel. Otherwise,
-
Step 5.
XYZ Axis Checks
Utilities > Panel Handling > Home
Utilities > Panel Handling > Manual Panel
This drawing represents a
left to right system. Flow
is reversed for a right to left
B
system
PN
OS
PN
B
W
— Verify operation and
-
Step 4.
Stage
Rails.
Load.