From the DOS prompt, type
i.
Type
j.
vs xray.cfg
Rampup so it has a value of
As before, use Alt W to save and Alt X to exit.
k.
Type
l.
ma
5DX Main Cabinet Radiation Integrity Check
7.
Cabinet Integrity and containment of X-Ray emissions, perform the
following:
• Complete a formal on-site radiation survey. Use two documents: Document
Number 5021-1979 is the procedure to follow, "X-ray Safety Test
Procedure," and Document Number E7200-90084 (Series I and II), or
N7200-90092 (Series 2L,3 and 5000) is the report form "X-Ray Safety Test
Report." (The latest versions can be obtained from the MSKC web site:
http://mskc.usa.agilent.com/)
Laminography Imaging Validation
8.
imaging is functioning, perform the following steps:
From the
a.
Load Panel
Select 400 FOV.
b.
From the
c.
Automatic. When prompted, load the confirmation and adjustment
board.
From the
d.
DOS prompt type
Type
e.
loadsync -f400 -b1
Type
f.
sync -e
Agilent 5DX Installation
ca
and edit the line labeled Cold Start
15
and press Enter to return to the master directory.
User Interface
menu, go to the
Program. Select
Utilities
menu, select
System Access Menu
gotocal -dots
and press Enter.
and press Enter.
(this is the original value).
— To verify the 5DX
— To verify that laminographic
Utilities
menu and select
from the pick list.
5DX_512
Panel Handling
then choose
, select
Quit from
and press Enter.
and press Enter.
5DX. At the
35