GE Centricity RA600 Service Manual page 42

Table of Contents

Advertisement

Hardware Installation
3-1 Components Used During Installation
Cable Part No.
N/A
N/A
N/A
N/A
4363149
N/A
Table 3-4: Items used for installation of B+ workstation
The Centricity RA600 Workstation should already be configured as per the factory settings. Also, the
operating system software and applications software are installed at the factory. The person
installing the workstation must physically interconnect workstation cables, and then configure the
system using site-specific information (i.e. IP address).
3-2 Line Voltage Selection
Line voltage selection is automatic for the workstation, monitors and most of the peripherals.
3-3 Power Connections
Power connection is behind the top rear panel of the B+ monitor. Power cables must be fitted with
proper plugs for the country where the workstation is installed. A distribution strip is supplied with the
system.
3-4 Network Connection
The ethernet network connections are made via hubs or switches.
IST 004 (B+) 1536 x 2048 Flat Panel Portrait Monitor Connections
From
CPU
CPU
CPU - Video Board
CPU
CPU
Monitor(s)
Page 42
To
Keyboard
Integrated Keyboard Cable
Network
10/100 BaseT Patch Cable
Monitor
Provided with monitor
Mouse
Integrated Mouse Cable
Power Outlet
Power Connection, USA
Power Outlet
Provided with monitor
Cable Detail

Advertisement

Table of Contents
loading

Table of Contents