GE Centricity RA600 Service Manual page 34

Table of Contents

Advertisement

Hardware Installation
Cable Part
No.
N/A
N/A
4363102
N/A
4363149
4363149
N/A
Table 3-2: Items used for installation of 1728 x 2304 workstation
The Centricity RA600 Workstation should already be configured as per the factory settings. Also, the
operating system software and applications software are installed at the factory. The person
installing the workstation must physically interconnect workstation cables, and then configure the
system using site-specific information (i.e. IP address).
3-2 Line Voltage Selection
Line voltage selection is automatic for the workstation, monitors and most of the peripherals.
3-3 Power Connections
Power cables must be fitted with proper plugs for the country where the workstation is installed. A
distribution strip is supplied with the system.
3-4 Network Connection
The ethernet network connections are made via hubs or switches.
From
CPU
CPU
CPU - Video Board
CPU
CPU
Monitor(s)
CPU VGA port
Page 34
IST 002 (A) 1728 x 2304 Portrait Monitor Interconnections
To
Keyboard
Integrated Keyboard Cable
Network
10/100 BaseT Patch Cable
Monitor Cable
Monitor Cable to CPU
Mouse
Integrated Mouse Cable
Power Outlet
Power Connection, USA
Power Outlet
Power Connection, USA
VGA Monitor
Service Monitor Tool
Cable Detail

Advertisement

Table of Contents
loading

Table of Contents