Maintenance; Maintenance Schedule - Swan Analytical Instruments AMI Codes-II O3 Operator's Manual

Table of Contents

Advertisement

AMI Codes-II O3

Maintenance

6.
6.1.
Every 2–4 weeks
Every 6 months
Yearly
By occurrence
A-96.250.881 / 070622
Maintenance

Maintenance Schedule

Clean reagent canisters and prepare new reagents.
Recommendation: Check photometer with verification kit
Verification, p.
Exchange reagent pump tubes, see
54.
E010, Sample flow low: Check sample flow (see also
Troubleshooting, p.
E020, FOME dirty:
E022, Reagent empty:
E065, Reagents low:
E066, Reagents expired,
46.
57)
Cleaning the Photometer, p. 51
Refill or replace Reagents, p. 43
Refill or replace Reagents, p. 43
Refill or replace Reagents, p. 43
Tube Replacement, p.
41

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AMI Codes-II O3 and is the answer not in the manual?

Questions and answers

Table of Contents