Opening The Peristaltic Pump Housing - Swan Analytical Instruments AMI Codes-II O3 Operator's Manual

Table of Contents

Advertisement

AMI Codes-II O3
Installation
3.5.3
26

Opening the peristaltic pump housing

For some electrical connections (see
is necessary to open the housing of the peristaltic pump. To do this,
proceed as follows:
1 Switch off the analyzer according to
nance, p.
42.
2 Remove the protection cap and all pump tubes as described in
Dismount pump tubes, p.
3 Unscrew the 4 screws of the peristaltic pump housing and re-
move the cover.
4 Disconnect the motor connector [A].
5 Feed the cable into the housing through one of the PG7 cable
glands (permissible cable thicknesses are specified in
thicknesses, p.
6 Connect the cable to the terminal block of the peristaltic pump ac-
cording to
Connection Diagram, p.
7 Reassemble in reverse order.
Connection Diagram, p.
55.
22).
Stop of Operation for Mainte-
A Motor connector
A
24.
A-96.250.881 / 070622
24), it
Cable

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AMI Codes-II O3 and is the answer not in the manual?

Questions and answers

Table of Contents