Lowara e-SV 1 Installation, Operation And Maintenance Manual page 258

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 13
it en fr de es pt nl da no sv fi is et lv lt pl cs sk hu ro bg sl hr sr el tr ru uk ar
14.
15.
2a
SV1125_M0019_C_sc
Italiano
1.
Tappo di riempimento e sfiato (a: sfiato
aperto, b: sfiato chiuso)
• 1, 3, 5, 10, 15, 22 SV: G 3/8
• 33, 46, 66, 92, 125 SV: G 1/2
2.
Tappo di scarico (a: perno centrale aperto,
b: perno centrale chiuso)
• 1, 3, 5, 10, 15 22 SV: G 3/8
• 33, 46, 66, 92, 125 SV: G 1/2
254
1
CH 10/24
2
CH 24
CH 24
2b
English
1.
Fill and vent plug (a: vent open, b: vent clo-
sed)
• 1, 3, 5, 10, 15, 22 SV: G 3/8
• 33, 46, 66, 92, 125 SV: G 1/2
2.
Drain plug (a: central pin open, b: central
pin closed)
• 1, 3, 5, 10, 15 22 SV: G 3/8
• 33, 46, 66, 92, 125 SV: G 1/2
3
CH 24
CH 10/24
CH 24
1a
1b
Français
1.
2.
1
5
CH 16
2
4
6
7
Bouchon de remplissage et de mise à l'air libre
(a : mise à l'air libre ouverte, b : mise à l'air li-
bre fermée)
• 1, 3, 5, 10, 15, 22 SV: G 3/8
• 33, 46, 66, 92, 125 SV: G 1/2
Bouchon de vidange (a : goupille centrale ou-
verte, b : goupille centrale fermée)
• 1, 3, 5, 10, 15 22 SV : G 3/8
• 33, 46, 66, 92, 125 SV : G 1/2
4
8
e-SV

Advertisement

Table of Contents
loading

Table of Contents