18.POINT PROJECTION

Point projection is used for projecting a point onto the baseline. The point to project can be either measured or
input. Displays the distances from the first point and point to project to the position at which a line extending
from point to project intersects the baseline at right angles.

18.1 Defining Baseline

• Defined baseline can be used in both setting-out line measurement and point projection.
PROCEDURE
1. In the second page of OBS mode screen, press [MENU],
then select "P-Project".
2. Enter the instrument station data then define the baseline.
"16.1 Defining Baseline" step 2 to 12
3. Press [OK] to define the baseline. <Point projection> is
displayed. Move to point projection measurement.
"18.2 Point Projection"
• It is also possible to perform point projection measurement by pressing [P-PROJ] when allocated to the OBS
mode screen.
Allocating the function key: "33.12 Allocating Key Functions"

18.2 Point Projection

Before performing point projection, the baseline must be defined.
PROCEDURE
1. Define the baseline.
"18.1 Defining Baseline"
Y direction
X direction
1st Pt.
Length
Offset
Point to project
Baseline
REM
Area calc.
S-O Line
S-O Arc
P-Project
PT to line
P o i n t p r o j e c t i o n
N p :
E p :
Z p :
LOAD
REC
79
2nd Pt.
1 0 3 . 5 1 4
1 0 1 . 4 2 3
1 2 . 1 5 2
MEAS
OK