Test; Manual Battery Test; Clear - Delta Modulon DPH Series User Manual

Three phase 100-300 kva
Hide thumbs Also See for Modulon DPH Series:
Table of Contents

Advertisement

7.11.4 Test

Path:
MAINTENANCE
After entering the TEST screen*
battery test.
TEST

7.11.5 Clear

Path:
MAINTENANCE
After entering the CLEAR screen*
(1) statistics, (2) historical event, (3) battery test result and (4) kilowatt hour (kWh).
CLEAR
Modulon DPH Series
1
NOTE:
*
means that the Administrator password is needed. For password
information, please refer to
UPS-1.1
MEASUREMENT
SETUP
1
NOTE:
*
means that the Administrator password is needed. For password
information, please refer to
UPS-1.1
MEASUREMENT
SETUP
Clear Statistics
Clear
Clear Battery Test Result
Clear
1
MAINTENANCE
LOG IN
Test
Administrator

Manual Battery Test

Start
1
MAINTENANCE
LOG IN
Clear
Administrator
Clear Historical Event
Clear Kilowatt Hour (kWh)
7-50
.
10:15
May 25,2018
EVENT LOG
On-Line
.
10:15
May 25,2018
EVENT LOG
On-Line
Clear
Clear

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dph-300k

Table of Contents