5.8.1 Power Module Installation
After firmly installing the UPS on the designated installation area according to the
instructions stated in
power module (optional) into the UPS.
1
2
Take out the two bracket ears, four M6 screws and eight M4 screws from the power
module's package.
3
Use the provided eight M4 screws to fix the provided two bracket ears on the two
sides of the power module. Please refer to
WARNING:
installation procedures.
2. The power module is heavy (> 36 kg (79.4 lb)). At least two people are
required for handling.
3. Please follow your UPS capacity to install the correct number of power
modules. Please refer to the table below.
UPS
Capacity
Power
Module Q'ty
4. Please install the power modules from the top layer of the power module
slot to the bottom layer of the power module slot in sequence.
, continue with the following steps to install the
100kVA/
150kVA/
100kW
150kW
2
3
5-43
5
Installation and Wiring
200kVA/
250kVA/
200kW
250kW
4
5
).
.
300kVA/
300kW
6