II Morrow Inc. NMC 2001 Operating Manual page 30

Navigation management computer
Hide thumbs Also See for NMC 2001:
Table of Contents

Advertisement

Power-Up Sequence
Power-Up Sequence (continued)
The Self-Test introductory page is displayed for 2 seconds.
The next self-test checks all of the NMC software, and takes about 4
seconds. During this time, the screen shown below is displayed.
The next self-test checks the User Waypoint database. If any errors are
found, the affected User Waypoints are cleared from memory, and the
display shown below is displayed until the user presses ENT. If no
errors are found, this page is not shown.
Next, all Flight Plan information is checked. If any errors are found,
the affected flight plans are cleared from memory, and the display
shown below is displayed until the user presses ENT. This page is not
shown if no flight plan errors are detected.
16
NAV
NAV
NAV
NAV
Operations

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nmc 2101Apollo nmc

Table of Contents