Start-up

8
Start-up
8.1

Initial start-up

NOTICE
The initial start-up may only be performed by VC999 Customer Service representatives! The
customer's personnel will receive thorough training at the same time.
WARNING
Unauthorised initial start-up itself can result in injury or damage to equipment or property!
8.1.1

Installation check

 Have all the lines and cables been properly laid and connected (no places where they may be bent
or chafed or where people may trip)?
 Is the oil level in the vacuum pumps OK?
 Are all the panels and covers in place?
8.1.2

Switching on the machine

The controls are explained in the "Controls" section.
 Switch on the machine at the main switch (1).
(Turn the main switch to I)
The current version of the control software is
shown on the left LED display.
 Press the "Vacuum pump" button. The vacuum
pump is then started. The lid of the vacuum
chamber then opens upwards automatically if the
vacuum chamber has not already been opened
manually beforehand.
CAUTION
Risk of trapping fingers! Take care not to trap
your fingers between the lid and the bottom part
of the machine as the lid of the vacuum chamber
opens! As you open the lid, make sure that there
is no-one in this potentially dangerous area!
2013-12-17
Art. no. 520.454
Fig. 8/1
Fig. 8/2
Page 28/91

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

K12nK12aK12na

Table of Contents