Komatsu PC210LC-11 Operation & Maintenance Manual page 465

With continuous camera view
Hide thumbs Also See for PC210LC-11:
Table of Contents

Advertisement

ATTACHMENTS AND OPTIONS
CHECK EVERY 100 HOURS SERVICE - see MAINTENANCE SECTION
LUBRICATING
1.
Boom cylinder foot pins (2 places)
2.
Boom foot pin (2 places)
3.
Boom cylinder rod end pin (2 places)
4.
Arm cylinder foot pin (1 place)
5.
Boom-Arm connection pin (1 place)
6.
Arm cylinder rod end (1 place)
7.
Bucket cylinder foot pin (1 place)
EVERY 50 HOURS SERVICE
LUBRICATING (MANUAL GREASE SYSTEM)
NOTICE
For the first 100 hours on new machines where the parts are setting in, carry out greasing every 10
hours.
1.
Set the work equipment in the greasing posture below, then lower the work equipment to the ground and
stop the engine.
2.
Using the grease pump, pump in grease through the grease fittings shown by arrows.
3.
After greasing, wipe off any old grease that was pushed out.
SUPER LONG FRONT BOOM AND ARM
1
2
3, 4, 5
KS001269
6-29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc210-11Pc210nlc-11Pc230nhd-11

Table of Contents