ASSEMBLY INSTRUCTIONS
Rigid Shear Bolt Clamp Shank
Installation
1. Attach shank to each 8" or 12" offset shear bolt
clamp assembly using 3/4 x 4 bolts and lock nuts in
top hole, use 5/8 x 5-1/2 Gr. 8 bolt, three 5/8 x 3/4 x
1-1/4 bushings, two 5/8 flat washers and 5/8 lock
nuts for bottom hole
3-16
See Figures
3-9.
2. Install the 2" cast flat point onto shanks with 1/2 x
3-3/4 bolts, 1/2 hd flat washers and 1/2 heavy nuts.
3. Install the 2" cast point onto shanks with 1/2 x 3-1/4
bolts, 1/2 hd flat washers and 1/2 heavy nuts.
4. Connect TW RH & LH shovels to each shank using
1/2 x 3 plow bolts, 1/2 hd flat washers and 1/2 heavy
nuts,
See Figures 2-4
locations of right hand and left hand shovels.
IMPORTANT
Right and left twisted shovels are determined by
direction of dirt flow when facing the direction of
travel.
through
2-13
for proper
F-1099-0521