Rigid Shear Shank And Shovel Installation - Landoll 2110 Operator's Manual

Coulter chisel
Hide thumbs Also See for 2110:
Table of Contents

Advertisement

Rigid Shear Shank and Shovel
Installation
1. Attach each shank assembly to each clamp
assembly using 3/4-10 x 4 hex head cap screws and
hex lock nuts in the top hole and 5/8-11 x 5 hex head
cap screw and hex lock nut in the lower hole (See
Figure 3-7.)
IMPORTANT
5/8 x 3/4 x 1-1/4 connex bushings shown in the
drawing are installed at the Landoll Corporation.
ASSEMBLY INSTRUCTIONS
2. Install 2 x 1 x 18 spikes or 1/2 x 4 x 26 twisted
shovels onto shanks as follows:
a. Connect 2 x 1 x 18 spike to each shank using
1/2-13 x 3 hex head cap screws, flat washers,
and heavy hex nuts (See Figure 3-7.)
b. Connect 1/2 x 4 x 26 twisted shovels to each
shank using 1/2-13 x 3 plow bolts, flat washers,
and heavy hex nuts. See Figures 2-2 thru 2-10
for recommended locations of right hand and
left hand shovels.
IMPORTANT
Right and left twisted shovels are determined by
direction of dirt flow when facing the direction of
travel.
3-15

Advertisement

Table of Contents
loading

Table of Contents