Rigid Shear Bolt Clamp Shank Installation - Landoll Coulter Chisel 2112 Operator's Manual

Table of Contents

Advertisement

ASSEMBLY INSTRUCTIONS
Rigid Shear Bolt Clamp Shank
Installation
1. Attach shank to each 8" or 12" offset shear bolt
clamp assembly using 3/4 x 4 bolts and lock nuts in
top hole, use 5/8 x 5-1/2 bolt, three 5/8 x 3/4 x 1-1/4
bushings, two 5/8 flat washers and 5/8 lock nuts
Figures
3-12.
3-18
2. Install the 2" cast flat point onto shanks with 1/2 x
3-3/4 bolts, 1/2 hd flat washers and 1/2 heavy nuts.
3. Install the 2" cast point onto shanks with 1/2 x 3-1/4
bolts, 1/2 hd flat washers and 1/2 heavy nuts.
4. Connect TW RH & LH shovels to each shank using
1/2 x 3 plow bolts, 1/2 hd flat washers and 1/2 heavy
See
nuts,
See Figures 2-4
locations of right hand and left hand shovels.
IMPORTANT
Right and left twisted shovels are determined by
direction of dirt flow when facing the direction of
travel.
NOTE
The center twisted shovel may be replaced with a
straight point.
through
2-9
for proper
F-1102-0721

Advertisement

Table of Contents
loading

Table of Contents