Connecting Power To The 2E4X-27R - Cabletron Systems 2E48-27R User Manual

Cabletron systems user's guide switch 2e48-27r/2e49-27r
Hide thumbs Also See for 2E48-27R:
Table of Contents

Advertisement

3.3.3

Connecting Power to the 2E4X-27R

The 2E4X-27R has two power supplies with automatic voltage
NOTE
sensing that allows connection to power sources ranging from
100–125 Vac or 200–250 Vac, 50/60 Hz.
To connect the
2E4X-27R
1.
Plug each power cord into a grounded wall outlet, see
take advantage of the load sharing and redundancy capabilities, each
power cord must be plugged into a dedicated ac outlet. The POWER
LED turns ON (green) and the CPU LED turns ON (green) briefly.
It takes approximately one minute for the 2E4X-27R to boot up.
NOTE
2.
Observe the LANVIEW LEDs. After a successful boot, the CPU LED
turns ON (green). If the CPU LED is not green after one minute and
turning amber, there is no power redundancy. Check the power cord
connections and the power source. If there are no problems with the
power cord connections or power source and the CPU LED is still not
green, contact the Cabletron Systems Global Call Center. Refer to
Section 1.5
2E48-27R/2E49-27R User's Guide
to the power sources, proceed as follows:
Figure 3-5 2E4X-27R Rear View
for details.
Installing the Device
Figure
Redundant
3-5. To
Primary
2314-62
3-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF