PTO Switch (Cont.)

Testing

1. Remove the control panel from the right console.
2. Disconnect the PTO switch from the wire harness.
3. With the switch in the ON position (button pulled OUT).
4. Using a digital multi-meter set to the OHM or Continuity setting, verify the following:
-Pin 2 and 5 should have continuity (closed)
-Pin 1 and 4 should have continuity (closed)
-Pin 1 and 7 should NOT have continuity (open)
-Pin 2 and 8 should NOT have continuity (open)
5. With the switch in the OFF position (button pushed IN)
-Pin 1 and 7 should have continuity (closed)
-Pin 2 and 8 should have continuity (closed)
-Pin 1 and 4 should NOT have continuity (open)
-Pin 2 and 5 should NOT have continuity (open)