ENGINE
Kohler Engine
Installation (Cont.)
15. Connect the chassis wire harness to the main engine wire harness (Figure 24).
Figure 24
16. Connect the fuel supply line to the fuel filter.
17. Install the engine guard.
18. Open the fuel supply valve.
19. Fill crankcase with approved oil and verify proper oil level.
20. Connect the battery terminals.
21. Verify proper function of the unit.
NOTE: Verify engine RPM is set to 3600 ± 50.
6-17
Digital Edition - TITAN® HD Service Manual
January 2018
Table of Contents