Kohler Engine
Removal
1. Park the machine on a level surface and disengage the PTO. Stop the engine, wait for all moving parts to stop
and remove the key. Engage the parking brake.
2. Disconnect the battery.
3. Close the fuel supply valve (Figure 14).
4. Remove the engine guard.
5. Remove the mower belt
6. Remove the hydrostatic drive belt from the engine pulley
page 7-9.
7. Disconnect the chassis wire harness from the main engine wire harness (Figure 15).
ENGINE
see "Mower Belt Replacement," chapter 8, page 8-5.
Digital Edition - TITAN® HD Service Manual
January 2018
Figure 14
see "Hydrostatic Drive Belt Removal," chapter 7,
Figure 15
6-11
Table of Contents