Kawasaki Engine
Installation (Cont.)
17. Connect the black engine wire (Figure 34).
18. Connect the red (B+) wire from starter (Figure 35).
NOTE: Torque nut on starter relay to 32 ± 3 in-lbs. (3-4 Nm).
6-24
Table of Contents
ENGINE
Figure 34
Figure 35
Digital Edition - TITAN® HD Service Manual
January 2018