Switching The Unit On - Thermo Scientific RadEye GX Operating Instructions Manual

Multi-purpose survey meter for external gm-detectors
Table of Contents

Advertisement

2.4

Switching the unit on

To switch on the RadEye GX, keep the ON button pressed for
at least one second. The sound generator (beeper) is initiated.
The start screen is displayed for two seconds.
Battery
voltage
After switching the unit on, the user is requested to confirm
the external probe that had been connected when the instru-
ment had been used the last time. Alternatively he can change
to another probe from the list of probes.
If the real time clock is set, actual time and date is displayed
for 3s.
RadEye GX, GX-L
Pi/Ff 14.09.2016
Firmware
version
DB-074 E
Date of last
instrument test
Checksum of the
firmware
2-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Radeye gx-l

Table of Contents