Note: Wait until the Load Check has successfully completed before leaving the instrument
unattended.
5. Progress of the run and the elapsed run time are displayed on the Protocol run in progress
screen.
Figure 65. Run progress screen.
5.6.1
Load check
Note: The load check feature is only available in EZ2 Connect Fx instruments.
The EZ2 Connect Fx comes with a built-in camera, which checks if you have loaded all of the
cartridges and labware into the correct positions on the worktable. However, the content of the
labware in the tip rack is not checked, so you must make sure that you have carefully followed the
instructions related to the protocol you are running.
The load check starts after you tap Start in the Run setup selection overview dialog window. For
more information on starting a run, refer to the Starting the protocol run and monitoring its progress
section.
After the load check starts, the camera moves above the worktable and checks all positions on the
cartridge rack and the tip rack, and the Load check is in progress screen is shown on the display.
The positions that you chose in the Select sample positions screen are highlighted.
EZ2 Connect and EZ2 Connect Fx User Manual 09/2021
93